Research projects
Below is a listing of completed WisDOT research projects.
This includes projects funded by WisDOT through the Wisconsin Highway Research
Program, the Policy Research Program, the WisDOT Material Testing and Quality Assurance
Unit, and the Construction and Materials Support Center.
Asphalt | Business
management | Concrete | Environment
| Geotechnics | Modal
| Policy | Roadways | Safety
and mobility | Structures
Most documents below are in Adobe PDF
format.
North
Central Pavement Research and Implementation Coordination
Partnership (formerly Frozen Four)
July 2009,TPF-5(119)
Transportation Pooled Fund Program
WisDOT contact: Laura
Fenley
Summary of Activities (48 KB) | Pooled
fund study
Analysis of Load-Induced Strains in a Hot Mix Asphalt
Perpetual Pavement
April 2009, FEP-01-09
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (863 KB)
Materials Characterization and Analysis of the
Marquette Interchange HMA Perpetual Pavement
August 2008, 0092-07-13/TPF-5(036)
Transportation Pooled Fund Program
WisDOT contact: Len
Makowski
Final report (1.1 MB) | Pooled
fund study
Evaluation of Interlayer Bonding in HMA Pavements
June 2008, 0092-02-13
Wisconsin Highway Research Program
WisDOT contact: Thomas
Brokaw
Final report (1 MB) | Research
Brief (232 KB)
Testing Wisconsin Asphalt Mixtures for the AASHTO 2002
Mechanistic Design Procedure
March 2008, 0092-04-07
Wisconsin Highway Research Program
WisDOT contact: Thomas
Brokaw
Final report (1.8 MB)| Research
Brief (182 KB)
Perpetual Pavement Instrumentation for the Marquette
Interchange Project
February 2008, 0092-06-01
Wisconsin Highway Research Program
WisDOT contact: Len
Makowski
Final
report
(2.6 MB)|
Research Brief (219 KB)
Development of In-Place Permeability
Criteria for HMA Pavement in Wisconsin
November 2007, 0092-06-02
Wisconsin Highway Research Program
WisDOT contact: Judie
Ryan
Final
report
(727 KB)
| Research
Brief (235 KB)
Test Method to Determine
Aggregate/Asphalt Adhesion Properties and Potential Moisture Damage
November 2007, 0092-05-12
Wisconsin Highway Research Program
WisDOT contact: Judie
Ryan
Final
report
(2.1 MB) |
Research
Brief
(187 KB)
Field Evaluation of Wisconsin Modified Binder
Selection Guidelines
October 2007, 0092-03-13
Wisconsin Highway Research Program
WisDOT Contact: Thomas
Brokaw
Final report
(343 KB) | Research
Brief
(224 KB)
Guidance, Parameters and Recommendations for
Rubblized Pavements
February 2007, 0092-05-07
Wisconsin Highway Research Program
WisDOT contact: Bob Arndorfer
Final
report (1 MB) |
Research Brief
(264 KB)
Life Cycle Cost Analysis of SMA Pavements and SMA
Application Guidelines
February 2007, 0092-04-06
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (1 MB) |
Research Brief
(330 KB)
Non-Nuclear Density Testing Devices and System to
Measure In-place Asphalt Pavement Density
January 2007, 0092-05-10
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (1.4 MB) |
Research Brief
(209 KB)
Layer
Coefficients for New and Reprocessed Asphaltic Mixes
January 2007, WI/SPR-04-00
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report
(901
KB)
Investigation of New Devices for use in
Determining Mechanistic Properties and Performance
April 2006, 0092-03-15
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (824 KB) |
Research Brief
(255 KB)
Development of Modulus-to-Temperature Relations
for HMA Mixtures in Wisconsin
November 2005, 0092-03-14
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (876 KB) |
Research Brief
(513 KB)
Guidelines for the Surface Preparation/Rehabilitation of
Existing Concrete and Asphaltic Pavements Prior to an Asphaltic Concrete Overlay
August 2005, 0092-04-05
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (2.9 MB) |
Research Brief
(402 KB)
Development of Rational Overlay
Design Procedures for Flexible Pavements
September 2005, 0092-00-05
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (688 KB) |
Research Brief
(219 KB)
Development of Guidelines for PG Binder Selection
for Wisconsin
July 2005, 0092-01-01
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final report
(2.6 MB) |
Research
Brief (350 KB)
Effects of Pavement Lift
Thickness on Superpave Mix Permeability and Density
April 2005, 0092-02-14c
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final report
(742 KB) |
Research
Brief (183 KB)
Using the Gyratory Compactor to
Measure the Mechanical Stability of Asphalt Mixes
January 2005, 0092-01-02
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final report (4.6
MB) |
Research
Brief (199 KB)
Evaluation Of The Interlayer Stress-Absorbing Composite (ISAC)
To Mitigate Reflective Cracking In Asphaltic Concrete Overlays
November 2004, WI-09-04
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report
(1.1 MB)
Tire
Rubber in Hot-Mix Asphalt Pavements
May 2004, WI-06-02
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report
(5.2 MB)
Evaluation
of Techniques for Asphaltic Pavement Longitudinal Joint Construction
November 2003, WI-08-03
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report
(1.8 MB)
Glassgrid
Pavement Reinforcement Product Evaluation
April 2003, FEP-03-03
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report
(1.9 MB)
Stone
Matrix Asphalt: The Wisconsin Experience
January 2002, WI/SPR-02-02
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report
(800 KB)
Evaluation of the Extent of HMA Moisture Damage
in Wisconsin as it Relates to Pavement Performance
January 2002, 0092-01-03
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (1.2 MB) | Research
Brief (202 KB)
Determining a
Temperature-Density Relationship after Completed Rolling of Hot
Mix Asphalt
January 2002, 0092-00-06
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (895 KB) | Research
Brief (195 KB)
The Effect of Fine Aggregate Angularity,
Asphalt Content and Performance Graded Asphalts on Hot-Mix Asphalt
Performance
January 2002, 0092-45-98
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (1.6 MB) | Research
Brief (150 KB)
Minimum Pavement Lift Thickness for Superpave
Mixtures
December 2001, 0092-00-04
Wisconsin Highway Research Program
WisDOT contact: Len Makowski
Final
report (1 MB) | Research
Brief (577 KB)
Asphaltic
Pavement Warranties - Five-Year Progress Report
June 2001
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (2.5 MB)
Characterization
of Simple and Complex Crumb Rubber Modified Binders
July 2000, WI/SPR-07-01
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.2 MB)
Fine
Tooth Milling Treatment of Rutted Asphaltic Concrete Pavements
October 1999, WI-13-99
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (84 KB)
Pulverize,
Mill & Relay Asphaltic Pavement & Base Course: Construction
Report
August 1999, WI-05-98
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (118 KB)
Full
Depth Asphalt Pavement
October 1998
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (15 KB)
Evaluation
of Excessive Cracking in Asphaltic Pavements
1997
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (58 KB)
Recycled
Materials in Highway Improvements
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (14 KB)
Return to top
Workforce
Development Summit for Wisconsin
September 2009, 0092-09-14
Policy Research Program,
WisDOT contact: Randy
Sarver
Final
report (1.2 MB)
Use of Functional Silos to Optimize Agency Decision Making
February 2008, 0092-05-22/TPF-5(036)
Transportation Pooled Fund Program
WisDOT
contact: WisDOT
Research
Final report
(591
KB) | Pooled
fund study
Evaluation of Owner Controlled Insurance Programs (OCIP's) for
Use on WisDOT Mega-Corridor Projects
July 2007, 0608-20-00
Construction and Materials Support Center
WisDOT contact: Don
Miller
Final
report (274 KB)
WisDOT Customer Satisfaction Survey Results
November 2004, 0092-04-01
Policy Research Program
WisDOT contact: Janet
Nodorft
Final report (2.7 MB) |
Research Brief (220 KB)
Develop
a Mechanism to Measure Customer Satisfaction With Products
and Services of the Department
October 2002, 0092-02-07
Policy Research Program
WisDOT contact: Janet
Nodorft
Final report
(1240 KB) |
Research
Brief
(250 KB)
Return to top
Eclipse® Shrinkage Reducing Admixture Product Evaluation
December 2008, FEP-01-08
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report
(292 KB)
Evaluation of Probing vs. Coring for Determination of PCC
Pavement Thickness
December 2008
Construction and Materials Support Center
WisDOT contact: Don
Miller
Final
report (220 KB)
Investigative Study of the Italgrip™ System
September 2008, WI-04-08
WisDOT Pavements and Materials Research
WisDOT contact: Deb
Bischoff
Final report (878 KB)
Evaluation of MMFX 2 Steel Corrossion-Resistant Dowel Bars In
Jointed Plain Concrete Pavement
August 2008, WI-03-08
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report (648 KB)
Effects of Ground Granulated Blast Furnace Slag in Portland
Cement Concrete (PCC) - Expanded Study
June 2008, 0092-05-01
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (834 KB)| Research
Brief (228 KB)
Portland Cement Concrete Pavements Over Rubbilized PCC
June 2008, 0092-00-11
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (515 KB)| Research
Brief (178 KB)
An Asset Management Approach to Drainage Infrastructure and
Culverts
June 2008, 0092-07-19/TPF-5(036)
Transportation Pooled Fund Program
WisDOT contact: WisDOT
Research
Final Report
(3.2 MB) | Pooled
fund study
Guidelines for Improving Full-Depth Repair of PCC Pavements in
Wisconsin
May 2008, 0092-07-03
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (2.9 MB) | Research
Brief (187 KB)
Analysis of Concrete Pavement Joints to Predict the Onset of
Distress
March 2008, 0092-05-05
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (2.9 MB)| Research
Brief (218 KB)
Expanded Study on the Effects of Aggregate Coating and Films
on Concrete Performance
March 2008, 0092-04-12
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final
report (1.9 MB)| Research
Brief (1.9 MB)
Material and Construction Optimization for Prevention of
Premature Pavement Distress in PCC Pavements
March 2008, TPF-5(066)
Transportation Pooled Fund Program
WisDOT contact: James
Parry
Final
report (12.7 MB)
| Pooled
fund study
Evaluation of Methods for Characterizing Air-Void
Systems in Wisconsin Paving Concrete
September 2007, 0092-03-16
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (16.8 MB) |
Research Brief (421 KB)
Evaluation of the URETEK Method of Pavement Lifting
April 2007, WI-02-07
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1
MB)
Investigation of Concrete Properties to Support Implementation
of the New AASHTO Pavement Design Guide
February 2007, 0092-06-03
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (988 KB) |
Research Brief (314 KB)
USH 16 Oconomowoc Bypass Report of Early Distress Portland Concrete
Pavement and Glomark Pavement Marking
March 2007, RED-04-07
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (827
KB)
Development
and Implementation of a Performance-Related Specification for a
Jointed Plain Concrete Pavement--I-39/90/94 Madison, Wisconsin
January 2007, WI/SPR-01-06
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (4
MB)
Cost-Effective
Concrete Pavement Cross Sections
June 2006, WI/SPR-03-05
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.3 MB)
Research and Development of Application of the
Federal Highway Administration’s HIPERPAV Model to Wisconsin
March 2006, 0092-04-11
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report (3.6 MB) |
Research Brief (275 KB)
Early Opening of Portland
Cement Concrete Pavements to Traffic
September 2005, 0092-01-04
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report
(1 MB) |
Research Brief (292 KB)
Effects of Heavy Loading on Wisconsin's Concrete
Pavements
July 2005, 0092-05-06
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report
(1.7 MB) |
Research Brief (344 KB)
Effects of Ground Granulated
Blast Furnace Slag in Portland Cement Concrete
February 2005, 0092-02-14a
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final report
(774 KB) |
Research Brief
(168 KB)
Report
on Early Distress (RED): Investigation of PCC Pavement on STH 29
August 2004, RED-08-02
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final report (6 MB)
Laboratory
Testing of Portland Cement Concrete Patch Material, Modified to
Reduce or Eliminate Shrinkage
July 2004, WI-01-04
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.8 MB)
Evaluation
of Roadware 10-Minute Concrete Mender for PCC Bridge Deck Crack
Sealing
January 2004, WI-02-04
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (9.6 MB)
Evaluation
of the Constructability & Performance of Micro-Silica Modified
Concrete Bridge Deck Overlays
December 2003, WI/FEP-10-03
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.6 MB)
Performance of Shoulders Adjacent to Concrete
Pavements
July 2003, 0092-02-05
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final
report (3.8 MB) |
Research
Brief
(592 KB)
Evaluation Of MMFX Corrosion-Resistant Steel Dowel Bars In Concrete Pavements
July 2003, WI-07-03
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.0 MB)
Dowel
Bar Retrofit
November 2002, WI-07-02
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (2.5 MB)
Effects of Aggregate Coatings and Films on
Concrete Performance
September 2002, 0092-00-07
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final
report (1.8 MB) |
Research
Brief
(640 KB)
Field Measurement of Water
Cement Ratio for Portland Cement Concrete - Phase II
June 2002, 0092-45-16
Wisconsin Highway Research Program
WisDOT contact: James
Parry
Final
report (562 KB) |
Research
Brief
(201 KB)
Report
on Early Distress (RED) Retrofit Dowel Bars on I-39
January 2002, RED-05-01
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (2.6 MB)
Report
on Early Distress (RED) Investigation of Shoulder Heave Problems
October 2001, RED-04-01
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.2 MB)
Strategies for Enhancing the
Freeze-Thaw Durability of Portland Cement Concrete Pavements
July 2001, 0092-45-76;WI/SPR-06-01
WisDOT Pavements and Materials Research
WisDOT contact: Debra
Bischoff
Final report
(629 KB)
Noise and Texture on PCC
Pavements: Results of a Multi-State Study
June 2000, 0092-45-91; WI/SPR-08-99
WisDOT Pavements and Materials Research
WisDOT contact: James
Parry
Final report
(7.3 MB)
Investigative Study of the Italgrip System - Noise Analysis
March 2000, WI/SPR-02-00
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (702 KB)
Investigation
of Feasible Pavement Design Alternatives for WisDOT
November 1999, WI/SPR-15-99
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (326 KB)
Pilot
Testing of a Quality Management Provision for Concrete Pavement
August 1999, WI/SPR-04
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (189 KB)
Random
Skewed Joints With and Without Dowels
December 1996, WI/FEP-07-96
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (54 KB)
The
Great Unsealing: A Perspective on PCC Joint Sealing
1996
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1.9 MB)
Concrete
Pavement Rehabilitation Manual
May 1992
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (6.9 MB)
Return to top
Develop an Asset Management Tool for Collecting and Tracking
Commitments on Selected Environmental Mitigation Features
September 2009, 0092-08-25
Policy Research Program
WisDOT contact: Dan
Scudder
Final report
(6.4 MB)
Pollutant Loading to Storm Water Run-Off from Highways: Impact
of a Highway Sweeping Program - Phase II
June 2009, 0092-04-04
Policy Research Program
WisDOT contact: Dan Scudder
Final report
(4.4 MB) | Research
Brief
(244 KB)
Effectiveness of a Hydrodynamic Settling Device and a
Stormwater Filtration Device in Milwaukee, Wisconsin
March 2009, 0092-00-03
Policy Research Program
WisDOT contact: Robert
Pearson
Final
report
(1.2 MB)| Research
Brief
(273 KB)
Use of a Stormwater Filtration Device for Reducing
Contaminants in Runoff from a Parking Lot in Madison, Wisconsin,
2005-07
March 2009, 0092-05-17
Policy Research Program
WisDOT contact: Wendy Braun
Final
report
(553 KB) | Research
Brief
(316 KB)
Fresh Water Mussel Study
July 2005, 0092-01-09
Policy Research Program
WisDOT contact: Gary
Birch
Final report
(892 KB) |
Research Brief
(489 KB)
Vehicle Inspection and Maintenance (I/M) Programs: Literature and Best Practices Scan
June 2002, 0092-02-09
Policy Research Program
WisDOT contact: Steve Hirshfeld
Final report
(174 KB) |
Research Brief
(467 KB)
Development
of Pilot Archaeological Database (PAD) for WisDOT District 3
August 2001, 0092-45-96
Policy Research Program
WisDOT contact: Robert
Arndorfer
Research Brief
(288 KB)
Pollutant Loadings to Stormwater
Run-Off from Highways: The Impact of a Sweeping Program
August 2002, 0092-45-82
Policy Research Program
WisDOT contact: Robert
Arndorfer
Final report (3.4 MB) |
Research Brief
(467 KB) |
Implementation plan
(27 KB)
Return to top
Comparison of Five Different Methods for Determining Pile
Bearing Capacities
September 2009, 0092-07-04
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (3.3 MB) | Research
Brief (256 KB)
Comparison of Basic Laboratory Test Results with More
Sophisticated Laboratory and In-Situ Tests Methods on Soils in
Southeastern Wisconsin
September 2009, 0092-06-05
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (372 KB) | Research
Brief (1.1 MB)
Development of Testing Methods to Determine Interaction of
Geogrid-Reinforced Granular Material for Mechanistic Pavement
Analysis
July 2009, 0092-07-05
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final report (3.2 MB) | Research
Brief (414 KB)
Evaluation of Bridge Approach Settlement Mitigation Methods
August 2008, 0092-00-13
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (15.4 MB) | Appendices (12.6 MB) | Research
Brief (471 KB)
Investigation of Vertical Members to Resist Surficial Slope
Instabilities
May 2008, 0092-05-09
Wisconsin Highway Research Program
WisDOT contact: Jeffrey
Horsfall
Final
report (4 MB) | Research
Brief (236 KB)
Determination of Shear Strength Values for
Granular Backfill Material Used by the Wisconsin Department of
Transportation
November 2007, 0092-05-08
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (2.3 MB) |
Research
Brief (256 KB)
Determination of Typical Resilient Modulus Values for Selected Soils in Wisconsin
February 2007, 0092-03-11
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (2 MB) |
Research
Brief (282
KB)
Effectiveness of Geosynthetics
in Stabilizing Soft Subgrades
April 2006, 0092-45-15
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (1.3 MB) |
Research
Brief (322
KB)
Field Performance of Sub-bases
Constructed with Industrial Byproducts
April 2006, 0092-45-18
Wisconsin Highway Research Program
WisDOT contact: Ken
Hanzel
Final
report (3.1 MB) |
Research
Brief (322
KB)
Equivalency of Subgrade
Reinforcement Methods
April 2006, 0092-00-12
Wisconsin Highway Research Program
WisDOT contact: Ken
Hanzel
Final
report (755 KB) |
Research
Brief (322
KB)
Development of Methodology to Include Strength
Contribution of Select Subgrade Materials in Pavement Structures
April 2006, 0092-03-12
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (350 KB) |
Research
Brief (322
KB)
Testing Methods to Determine
Long Term Durability of Wisconsin Aggregate Resources
October 2005, 0092-02-03
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (714 KB) |
Research
Brief (442
KB)
Investigation of Standard Penetration Torque Testing (SPT-T) to Predict Pile Performance
September 2005, 0092-04-09
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (4.3 MB) |
Research
Brief (522
KB)
Investigation of the DCP and SSG as Alternative
Methods to Determine Subgrade Stability
September 2005, 0092-01-05
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (4.1 MB) |
Research
Brief (293
KB)
Application of Electromagnetic Geophysics (EMG) Technology to Subsurface Investigations
July 2005, 0092-04-08
Wisconsin Highway Research Program
WisDOT contact: Robert
Arndorfer
Final
report (430 KB) |
Research
Brief (414
KB)
Determination of Influences on Support Strength of Crushed
Aggregate Base Course Due to Gradational, Regional and Source
Variations
October 2004, 0092-02-01
Wisconsin Highway Research Program
WisDOT contact: Dan
Reid
Final
report (10 KB) |
Research
Brief (146
KB)
Estimating Soil/Pile Setup
September 2003, 0092-00-14
Wisconsin Highway Research Program
WisDOT contact: Jeff
Horsfall
Final report
(2 MB) |
Research
Brief (477 KB)
Evaluation
of Polymer for Soil Stabilization
August 2003, WI-06-03
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (716 KB)
Comprehensive
Subgrade Deflection Acceptance Criteria - Executive Summary
Date: November 2002
Report Number: WI/SPR-05-02
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (472 KB)
Comprehensive
Subgrade Deflection Acceptance Criteria - Pilot Implementation
January 2002, WI/SPR-04-02
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (6.7 MB)
Comprehensive
Subgrade Deflection Acceptance Criteria - Phase III Final Report
January 2001, WI/SPR-02-01
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (2 MB)
Development of Comprehensive
Subgrade Deflection Acceptance Criteria
January 2001, 0092-45-95
WisDOT Pavements and Materials Research
WisDOT contact: Debra
Bischoff
Executive Summary
(472 KB) |
Phase III Final
report (2 MB) |
Pilot Implementation
(6.7 MB)
Polyacrylamide
as a Soil Stabilizer for Erosion Control
January 2001, WI-06-98
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (1.5 MB)
Erosion
Control Product Acceptability Lists for Multi-Modal Applications
January 2001
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (283 KB)
Milwaukee
General Mitchell International Airport Class 1 Erosion Mat Test Site
October 2000, WI-08-00
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (84 KB)
Evaluation
of the GEOWEB and J.K. Structure Slope Stabilization Methods
January 2000, WI-17-99
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (2.8 MB)
Flowable
Fill as Backfill for Bridge Abutments
December 1999, WI-16-99
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (3.2 MB)
Return to top
The Socioeconomic Benefits of Transit in
Wisconsin, Phase II: Benefit Cost Analysis
August 2006, 0092-05-14
Policy Research Program
WisDOT contact: Robert
Russell
Final report
(641 KB) |
Research Brief (294 KB)
The Socioeconomic Benefits of Transit in Wisconsin
November 2003, 0092-03-07
Policy Research Program
WisDOT contact: Robert
Russell
Final report
(1.4 MB) |
Research Brief
(559 KB)
Return to top
Costs and Benefits of Increasing Load Size for
Containers
September 2009, 0092-08-26
Policy Research Program
WisDOT contact: Chuck
Lorentz
Final report
(2.4 MB)
Wisconsin Department of Transportation Communication with
Local Government: Focus Group Report
January 2009, 0092-08-23
Policy Research Program
WisDOT contact: Lori
Richter
Final report
(346 KB) |
Research Brief (222 KB)
Synthesis of Best Practices for the Development of an Integrated Data and Information Management Approach
September 2008, 0092-02-21/TPF-5(036)
Transportation Pooled Fund Program
WisDOT contact: WisDOT
Research
Final
report
(690 KB)
| Pooled fund
study
Evaluation of Owner Controlled Insurance Programs (OCIPs) for Use on WisDOT
Mega-corridor Projects
July 2007, 0608-20-00
Construction and Materials Support Center
WisDOT contact: Don
Miller
Final report
(281 KB)
Upper Midwest Freight Corridor Study
March 2007, TPF-5(078)
Transportation Pooled Fund Program
WisDOT contact: Sandy
Beaupre
Final report (5.4 MB) | Pooled
fund study
Examining Stress Levels Of DSP Enforcement Personnel and Intervention Techniques - Phase II
July 2005, 0092-03-01
Policy Research Program
WisDOT contact: Sue
Hunter
Final report
(641 KB) |
Research Brief (294 KB)
Economic
and Land-Use Impacts of Wisconsin State Trunk Highway 29
September 2004, 0092-02-17 and 0092-03-06
Policy Research Program
WisDOT contact: Dennis
Leong
Final report (6.9
MB) |
Research Brief
(482 KB) |
Video brief (3 min 17 sec)
Local Roads Communication Analysis
September 2003, 0092-03-08
Policy Research Program
WisDOT contact: Scott
Bush
Final report
(223 KB) |
Research Brief
(387 KB)
Wisconsin's
Off-Road Fuel-Tax Collection Process Analysis: A
Midwestern Comparative Analysis and Assessment
October 2002, 0092-02-08
Policy Research Program
WisDOT contact: Allyn
Lepeska
Final report
(223 KB) |
Research Brief
(223 KB)
Transportation
Investments, Economic and Land Use Goals
June 2002, 0092-45-97
Policy Research Program
WisDOT contact: Dennis
Leong
Final report
(2.2 MB) |
Research
Brief
(233 KB) | Implementation
plan
(27 KB)
Examining Stress
Levels of State Patrol Enforcement Personnel and Intervention
Techniques
April 2002, 0092-01-07
Policy Research Program
WisDOT contact: Sue
Hunter
Final report
(483 KB) |
Research
Brief
(577 KB)
Return to top
Evaluation of Flexible Delineator Posts and Diamond Grade
Reflective Sheeting
November 2009, FEP-05-09
WisDOT Pavements and Materials Research
WisDOT contact: Deb
Bischoff
Final report
(607 KB)
Pavement Warranty Program in Wisconsin: 12-Year Evaluation
June 2009, WI-03-09
WisDOT Pavements and Materials Research
WisDOT contact: Laura
Fenley
Final Report
(1 MB)
Frozen Road Operation Improvements
May 2009, 0092-06-11/TPF-5(036)
Transportation Pooled Fund Program
WisDOT
contact: Jim
McDonnell
Final report
(5.1 MB) | Pooled
fund study
North/West Passage Transportation Pooled Fund Program
December 2008, TPF-5(093)
Transportation Pooled Fund Program
WisDOT contact: Phil
DeCabooter
Pooled
fund study
Database Development for a Pavement Performance Analysis System
April 2008, 0092-06-13/TPF-5(036)
Transportation Pooled Fund Program
WisDOT contact: WisDOT
Research
Final report (1.2 MB) | Pooled
fund study
Calibration Accuracy of Manual and Ground-Speed-Controlled Salters
February 2008, 0092-06-21/TPF-5(092)
Transportation Pooled Fund Program
WisDOT contact: Mike
Sproul
Final report (1.7 MB) |
Research
Brief
(562 KB) | Pooled
fund study
Implementation of GPS Controlled Hwy Const Equipment Phase II
January 2008, 0657-32-24
Construction and Materials Support Center
WisDOT contact: Don
Miller
Final
report (2.6 MB)
ET-2000
- End Treatment for Guardrail
December 2007, WI/FEP-03-07
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (939 KB)
Improved Construction Cost Estimating Procedures For
Developing the PS&E Estimate at WisDOT
August 2007, 0657-45-12
Construction and Materials Support Center
WisDOT contact: Don
Miller
Final
report (1.3 MB)
Implementation of GPS Controlled Highway Construction Equipment
April 2007, 0092-07-11
Construction and Materials Support Center
WisDOT contact: Don
Miller
Final
report (1.9 MB)
Aluminum
Sign Corrosion Investigation
September 2004, WI-06-04
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (2.3 MB)
Evaluation
of Bottom Ash as a Base Course
July 2004, FEP-08-04
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (5.4 MB)
Experimental
Culvert Pipe, STH 80
November 2003, WI/FEP-09-96
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (3.5 MB)
Scotch-Lane
Wet Reflective Removable Tape - Series 750
October 2003, WI-03-00
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (275
KB)
Public
Perceptions of the Midwest's Pavements: Executive Summary -
Wisconsin - Final Report (Summary of Phases I, II, and III)
January 2001, WI/SPR-01-01;0092-45-59
Policy Research Program
WisDOT contact: Deb
Bischoff
Final
report (162 KB)
Experimental
Installation of Large Diameter
(48 in.) High Density Polyethylene
Culvert Pipe (HDPE) - Construction Report
September 2000, PE-09-00
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (1 MB)
Public
Perceptions: Phase III Targeted Surveys
September 2000
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (282 KB)
Public
Perceptions: Phase II Statewide Surveys
rev. May 1999
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (149 KB)
Performance
Evaluation of Drained Pavement Structures
December 1998, WI/SPR-04-08
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (287 KB)
1997
Ride Measurement Report
May 1998
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (5 MB)
Living
Noise Barrier
January 1998, WI/FEP-02-98
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (10 MB)
Public
Perceptions: Wisconsin Winter Ride Survey Report
September 1997; rev. 2001
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (596 KB)
1996
Ride Measurement Report
April 1997
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (389 KB)
Durisol
Noise Barriers
April 1997, WI/FEP-02-97
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (1 MB)
1995
Ride Measurement Report
February 1996
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (4.6 MB)
Wisconsin's
Pavement Management System: The Next Generation
1996
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (32 KB)
A
Pavement Preservation Strategy
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (103 KB)
Pavement
Design and Programming Options: European Design to Maintain Only
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (282 KB)
Preserving
Our Highways and Bridges
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
reports (4 MB)
The
Pavement Type Selection Process
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (81 KB)
Public
Perceptions: Phase I Focus Group Content Analysis - Wisconsin
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (4 MB)
Public
Perceptions: Phase II Appendix Data Summary
WisDOT Pavements and Materials Research
WisDOT contact: Robert
Arndorfer
Final
report (51 KB) | Pooled
fund study
Return to top
Strategies for Truck Parking
September 2009, 0092-08-28
Policy Research Program
WisDOT contact: David
Simon
Final
report (1.6 MB)
Animal
Vehicle Crash Mitigation Using Advanced Technologies
March 2009, SPR-3(076)
Transportation Pooled Fund Program
WisDOT contact: Jim
Merriman
Final report
(2.5 MB) | Pooled
fund study
Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision Support
April 2008, TPF-5(086)
Transportation Pooled Fund Program
WisDOT contact: David
Vieth
Final report-Pooled
fund study
(554 KB) | Final report-WisDOT
(1.7 MB)
| Pooled
fund study
Bicycle Crash Analysis Tool
September 2006, 0092-05-18
Policy Research Program
WisDOT Contact: Thomas
Huber
Final
report (857 KB) |
Research Brief
(107 KB)
Evaluation of User Impacts of Transit Automatic
Vehicle Location Systems in Medium and Small Size Transit Systems
August 2006, 0092-00-01
Policy Research Program
WisDOT Contact: David
Lowe
Final
report (415 KB) |
Research Brief (132 KB)
Truncated
Warning Dome Installations - Technical Note
June 2005, WI-01-05
Policy Research Program
WisDOT Contact: Peter
Kemp
Final
report (522
KB)
Evaluation of Variable Message Signs in
Wisconsin: Driver Survey
March 2005, 0092-45-17
Policy Research Program
WisDOT Contact: John
Corbin
Final
report (625 KB) |
Research Brief
(143 KB)
Evaluation of Ramp Meter Effectiveness for
Wisconsin Freeways, A Milwaukee Case Study: Parts 1, Diversion and
Simulation; Part 2, Ramp Metering Effect on Traffic Operations and
Crashes
November 2004, 0092-45-17
Policy Research Program
WisDOT Contact: John
Corbin
Final report,
Parts 1 and 2 (3.3 MB) |
Research Brief
(326 KB)
Development of Methods for
Benefits Assessment of ITS Deployment in Wisconsin - Phase II
September 2004, 0092-02-16
Policy Research Program
WisDOT Contact: Phil
DeCabooter
Final report (2.6
MB) |
Research Brief (239 KB)
Truncated Warning Dome System for Handicap Access Ramps
November 2003, WI-04-03
Policy Research Program
WisDOT Contact: Peter
Kemp
Final report (6.6 MB)
Evaluate the
Effectiveness of the Occupational Licensing Program in Terms
of Providing Limited Operating Privileges to Problem
Drivers and Its Impact on Highway Safety
January 2003, 0092-02-10
Policy Research Program
WisDOT Contact: Mitchell
Warren
Summary report
(242 KB) |
Phase I
(548 KB) |
Phase II
(456 KB) |
Phase III
(1.3 MB) |
Research
Brief
(568 KB)
Perceptions and Expectations of
Drivers: A Literature and Best Practices Scan
August 2002, 0092-02-12
Policy Research Program
WisDOT Contact: John
Corbin
Final
report
(269 KB) | Research
Brief
(188 KB) |
Implementation
plan
(118 KB)
ITS Data Management and
Archiving: Literature and Best Practices Scan
May 2002,
0092-02-11
Council on Research
WisDOT Contact: John
Corbin
Final report
(373 KB) |
Research
Brief
(570 KB)
Evaluation
of Lumimark Traffic Safety Marking System
April 2002, WI-03-02
WisDOT Pavements and Materials Research
WisDOT contact: Steve
Krebs
Final
report (1370 KB)
Impact on Highway Safety of
Multiple Administrative Driver License Withdrawal Systems
March 2002, 0092-01-08
Policy Research Program
WisDOT Contact:
WisDOT Research
Final report
(116 KB) |
Research
Brief
(60 KB)
Improved Use of the Inspection
Selection System (ISS) for Motor Carrier Safety
January 2002, 0092-00-02
Policy Research Program
WisDOT Contact: Sandra
Huxtable
Final report
(85 KB) |
Research Brief
(1.5 MB) |
Implementation
plan
(27 KB)
Licensing the High Risk Driver
September 2001, 0092-45-14
Policy Research Program
WisDOT Contact:
WisDOT Research
Final report
(283 KB)
Development of Methods for
Benefits Assessment of ITS Deployment in Wisconsin
December 2000, 0092-45-20
Policy Research Program
WisDOT Contact: Phil
DeCabooter
Final report
(192 KB) |
Research
Brief
(23 KB)
Partnerships for Intelligent
Transportation Systems
July 2000, 0092-45-11
Policy Research Program
WisDOT Contact: Phil
DeCabooter
Final report
(1.9 MB) |
Research
Brief (110 KB)
When to Apply Spring Load
Limits?
March 2000, 0092-45-70
Policy Research Program
WisDOT contact: WisDOT
Research
Research Brief
(129 KB)
Return to top
Fatigue Risks in the Connections of Sign Support Structures:
Phase I
July 2009, 0092-08-14
Wisconsin Highway Research Program
WisDOT contact: Travis
McDaniel
Final
report (7.2 MB) | Research Brief
(533 KB)
A Systematic Process for Using Federal Aid to Support Bridge
Preventive Maintenance
November 2008, 0092-07-20/TPF-5(036)
Transportation Pooled Fund Program, WisDOT contact: Scot
Becker
Final report
(1 MB) | Pooled
fund study
Implementation of Rehabilitation Techniques for
Concrete Bridges
November 2008, 0092-06-08
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
WHRP
study page
Bridge Integrated Analysis and Decision Support: Case Histories
Phase I
August 2008, 0092-04-15
Wisconsin Highway Research Program
WisDOT contact: Edward
Fitzgerald
Final
report (3.6 MB) | Research Brief
(288 KB)
Specification and Design of Fiber Reinforced Bridge Deck Forms
for Use on Wide Flange T-Girders
July 2008, 0092-06-07
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final
report (3.3 MB) | Research Brief
(281 KB)
Bridge
Deck Crack Sealers Implementation Project
July 2008, 0092-07-22
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
WHRP
study page
Reducing Shrinkage Cracking of Structural Concrete
through the Use of Admixtures
February 2007, 0092-04-13
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final
report (1.3 MB) |
Research Brief
(322 KB)
Impact of Railcar Weight Changes on Wisconsin
Bridges
October 2006, 0092-05-13
Policy Research Program
WisDOT contact: Frank
Huntington
Final report
(1.4 MB) |
Research
Brief (306 KB)
Evaluation
of Concrete Deck and Crack Sealers
August 2005, 0092-03-09
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final
report (1.1 MB) |
Research Brief
(260 KB)
Non-Destructive Testing of
Highway Bridge Structures
June 2005, 0092-00-15
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final
report (1.4 MB) |
Research Brief
(238 KB)
Rehabilitation Techniques for
Concrete Bridges
June 2005, 0092-01-06
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final report part
1 (176 KB) |
Final report part 2 (1.7
MB) |
Final report part 3 (3.8
MB) | Appendix A
(5.3
MB), Appendices
B-D (13
MB), Appendices
E-F (5.1
MB) | Research
Brief (353
KB)
Health Monitoring of Bridge Structures and
Components Using Smart-Structure Technology
March 2005, 0092-04-14
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final
report Vol. 1 (607 KB) |
Final
report Vol. 2 (1.7 MB) |
Research
Brief (197 KB)
Structural Analysis of Sign and
Luminaire Support Structures
September 2004, 0092-00-16
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final
report
(7.4 MB) |
Research
Brief (438 KB)
Integrated Field and Office Tools for Bridge
Management
October 2003, 0092-03-10
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final report
(2.7 MB) |
Research
Brief
(353 KB)
Rapid Strengthening of
Reinforced Concrete Bridges
October 2003, 0092-02-14b
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final report
(5.7 MB) |
Research
Brief
(516 KB)
Design & Prototype:
Automated Routing & Evaluation of Bridge Restrictions for
Oversize/Overweight Permitting
May 2002, 0092-45-19
Policy Research Program
WisDOT contact: Scot
Becker
Final
report (1.2 MB) |
Research Brief
(274 KB) |
Implementation
plan
(26 KB)
Assessment & Rehabilitation
Strategies/Guidelines to Maximize Service Life of Concrete
Structures
February 2002, 0092-00-17
Wisconsin Highway Research Program
WisDOT contact: Scot
Becker
Final report
(1 MB) Research
Brief
(186 MB)
Return to top
|